Small concrete mixing plant producing in winter

2015-04-17 17:09:42

As we all know, many of the devices are required for maintenance and repair, and some large-scale mechanical engineering equipment maintenance or when there are points of the season. In the summer and winter maintenance of the road maintenance is not the same.

What stationary concrete batching plant time to stand in the winter maintenance, we know that due to seasonal reasons, after the concrete mixing station operation, the operator after the day’s work is the need for the inner and outer walls of the mixing tank equipment fouling, discharge mouth, stirring shaft and the residue discharge gate on the cleanup work, you can use the device of the ground water to wash room, if necessary, can be put in a small amount of gravel and water, stirring after ten minutes to put out.

These are the day after you run the play needs to be done. After the end of the winter, you need to run the equipment is required to put the best pumps, additional coolant pump, water tank, additional agents inside the water tank and residues, so in the cold season to set damage to the pump and piping, but also need to start additional coolant pump water pump operation for about a minute, these are winter road maintenance fields of concrete batch plant. Concrete Mixing standing winter if it is not used, then instrument construction equipment needs to be turned on twice a week, and the time required for half an hour each boot.

This prevents winter wet concrete batching plant features for long periods of use cause frostbite, or will not boot phenomenon.